Automotive Electrical Wiring & Distribution Plant Extension
- Location
- Kenitra / Tanger
- Year
- 2020
- Floor area
- 12 000 m²
- Mission
- Extension industrielle Built-to-Suit • Continuité d'exploitation

Context & client needs
Supporting American Tier-1 giant Lear Corporation with the expansion of its manufacturing footprint to accommodate new electric and hybrid vehicle harness architectures.
The operational challenge
Execute structural expansion and heavy utility tie-ins while maintaining adjacent continuous 24/7 manufacturing operations with zero contamination, dust ingress, or power cuts.
Universal Integration scope of work
Main assembly hall extension, LV distribution upgrades, loading dock re-engineering, and full climate control installation across manufacturing bays.
Solutions & systems delivered
Outcome & measured performance
Delivered 2 weeks ahead of contractual schedule. Zero minutes of unplanned manufacturing downtime incurred by client.