TI AutomotiveAutomobile • Systèmes de Fluides & Tubulures

Thermal & Fuel Fluid Systems Plant — Tangier Automotive City

Location
Tanger Automotive City (TAC)
Year
2018 - 2019
Floor area
14 500 m²
Mission
Conception-Construction Built-to-Suit • Lots techniques avancés
Thermal & Fuel Fluid Systems Plant — Tangier Automotive City

Context & client needs

TI Automotive (TI Fluid Systems), global tier-1 leader in fluid storage, carrying and delivery systems, required a high-efficiency plant close to Renault Tangier and Stellantis Kenitra manufacturing clusters.

The operational challenge

Integrate specialized thermoforming, plastic extrusion, and robotic tube bending areas with massive thermal dissipation requirements, reinforced machinery pits, and zero-downtime power reliability.

Universal Integration scope of work

From preliminary design to commissioning from October 2018 to April 2019: complete kinematic flow design, large-bay industrial building, reinforced machine pits, centralized 800 kW industrial chiller plant, AHUs, and executive headquarters.

Solutions & systems delivered

Engineered machine pits with cast-in drainage trenches for rapid process fluid containment
Closed-loop industrial chilled water network delivering continuous cooling for thermoforming lines
High-density certified sprinkler deluge system engineered for plastic manufacturing fire hazards
Thermal shielding and acoustic baffles installed across extrusion halls ensuring operator ergonomics

Milestones & site timeline

  1. Foundation Pours & Machine Pits

    Octobre 2018

    Fine earthworks and precision pit concrete pouring for extrusion equipment.

  2. Industrial Superstructure Erection

    Décembre 2018

    Structural steel erection, sandwich panel cladding, and roofing.

  3. Process Utilities & Industrial Chilling

    Février 2019

    800 kW chiller plant installation and closed-loop process piping.

  4. Qualification & Start of Production

    Avril 2019

    Operational sign-off, client audit approvals, and production ramp-up.

More site photos

Outcome & measured performance

Plant successfully handed over in April 2019 with 100% compliance across OEM audits (Renault, PSA). Zero delay recorded in serial production SOP.

Project case study: scope, responsibilities and documented outcomes.Discuss a similar project

Tell us about your project, even at an early stage.

We will arrange an initial discussion to clarify your requirements and the appropriate scope of support. An NDA can be arranged on request before sensitive documents are shared.