YazakiÉquipementier Automobile Mondial
Industrial Utilities Modernization & Energy Efficiency Overhaul
- Location
- Meknès / Kénitra
- Year
- 2022
- Floor area
- 22 000 m²
- Mission
- Modernisation industrielle • Électrification & Efficacité Énergétique

Context & client needs
Strategic decarbonization and energy-efficiency overhaul for Japanese manufacturing pioneer Yazaki across Moroccan production operations.
The operational challenge
Complete turnkey replacement of central compressed air generation and piping grid without disrupting daily assembly shifts.
Universal Integration scope of work
Comprehensive energy audit, installation of latest variable-speed screw compressors, thermal pipe lagging, and industrial BMS telemetry installation.
Solutions & systems delivered
Mobile containerized backup compressor unit keeping production fully supplied during changeover
Compressed air leak rate compressed from 38% down to under 4% across entire plant
Real-time energy dashboard tracking kWh per produced wiring harness unit
Outcome & measured performance
Verified 22% annual electrical savings on facility utilities. Project ROI achieved within 18 months.
Project case study: scope, responsibilities and documented outcomes.Discuss a similar project